Topic: Reportaj santier - 13 August 2010

7 posts, 3460 views
  • Utilizator anonim
  • Posted:
  •  

Reportaj santier - 13 August 2010 Utilizator anonim

Lucrarile sunt realizate spre 95%, astazi se incheie montarea grinzilor principale ale tablierului podului hobanat.
IMG_9278.JPG (260.18 KB; downloaded 3016 times)
IMG_9282.JPG (263.48 KB; downloaded 3007 times)
IMG_9283.JPG (226.62 KB; downloaded 3005 times)
IMG_9284.JPG (258.82 KB; downloaded 3017 times)
IMG_9286.JPG (252.04 KB; downloaded 3020 times)
IMG_9287.JPG (285.4 KB; downloaded 3009 times)
IMG_9291.JPG (266.14 KB; downloaded 3008 times)
IMG_9293.JPG (239.75 KB; downloaded 2997 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Tot la podul hobanat se lucreaza la partea de hobane, se monteaza piesele din pilon pe unde in maxim 2 saptamani vor incepe sa fie trase hobanele.
IMG_9290.JPG (269.46 KB; downloaded 2981 times)
IMG_9298.JPG (252.06 KB; downloaded 2987 times)
IMG_9299.JPG (239.2 KB; downloaded 2996 times)
IMG_9300.JPG (187.5 KB; downloaded 2989 times)
IMG_9301.JPG (264.55 KB; downloaded 3014 times)
IMG_9401.JPG (180.13 KB; downloaded 2995 times)
IMG_9409.JPG (302.57 KB; downloaded 3005 times)
IMG_9412.JPG (259.31 KB; downloaded 3007 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Astazi a fost turnata ultima sectiune a tablierului pasajului din zona Plevnei, mai ramane capatul acesteia saptamana viitoare. Astfel se incheie toate lucrarile de turnare a tablierului la Pasajul Basarab.
IMG_9297.JPG (248.28 KB; downloaded 3000 times)
IMG_9304.JPG (241.27 KB; downloaded 2981 times)
IMG_9305.JPG (232.71 KB; downloaded 3001 times)
IMG_9312.JPG (223.76 KB; downloaded 2995 times)
IMG_9319.JPG (218.9 KB; downloaded 3002 times)
IMG_9335.JPG (218.47 KB; downloaded 2995 times)
IMG_9339.JPG (230.28 KB; downloaded 3005 times)
IMG_9342.JPG (274.99 KB; downloaded 2995 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Luna viitoare se incheie realizarea finisajelor pe tot tablierul intre podul hobanat si Vasile Milea.
IMG_9343.JPG (191.59 KB; downloaded 2999 times)
IMG_9350.JPG (307.36 KB; downloaded 2992 times)
IMG_9352.JPG (205.75 KB; downloaded 2991 times)
IMG_9353.JPG (222.88 KB; downloaded 2989 times)
IMG_9365.JPG (213.25 KB; downloaded 2970 times)
IMG_9372.JPG (258.13 KB; downloaded 3002 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

In toata zona Vasile Milea - Grozavesti (partial si podul Grozavesti) se redeschide traficul pana pe 20 septembrie.
IMG_9359.JPG (282.05 KB; downloaded 2964 times)
IMG_9364.JPG (311.94 KB; downloaded 2974 times)
IMG_9367.JPG (304.8 KB; downloaded 2987 times)
IMG_9369.JPG (314.03 KB; downloaded 2987 times)
IMG_9371.JPG (311.2 KB; downloaded 2991 times)
IMG_9373.JPG (300.81 KB; downloaded 2984 times)
IMG_9374.JPG (316.45 KB; downloaded 2985 times)
IMG_9376.JPG (283.97 KB; downloaded 2987 times)
IMG_9378.JPG (261.8 KB; downloaded 2980 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Pana la 15 septembrie se incheie si realizarea liniilor de tramvai in intersectia Giulesti - Plevnei.
IMG_9310.JPG (272.91 KB; downloaded 2973 times)
IMG_9314.JPG (266.05 KB; downloaded 2978 times)
IMG_9321.JPG (273.64 KB; downloaded 2972 times)
IMG_9331.JPG (246.04 KB; downloaded 3023 times)
IMG_9380.JPG (261.29 KB; downloaded 2991 times)
IMG_9381.JPG (283.8 KB; downloaded 2976 times)
IMG_9385.JPG (272.14 KB; downloaded 2975 times)
IMG_9394.JPG (188.14 KB; downloaded 2976 times)
IMG_9396.JPG (282.4 KB; downloaded 2987 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Lucrarile au avansat si pe Sos. Orhideelor. Traficul se va redeschide in aproape toate zonele adiacente pasajulu treptat incepand cu luna septembrie.
IMG_9294.JPG (225.69 KB; downloaded 2969 times)
IMG_9332.JPG (304.54 KB; downloaded 2945 times)
IMG_9346.JPG (297.46 KB; downloaded 2928 times)
IMG_9348.JPG (326.83 KB; downloaded 2926 times)

 


Home page  • 
Parent forum: Arhiva reportajelor anului 2010  • 
Choose destination

Since our 2297 forum members have written 422410 posts in 5262 topics and 515 subforums.

 

© 2009 - 2024 Asociația „Metrou Ușor”

Powered by PhpBB In DotNet

The Terms Of Use